Judy Middleton 2002 revised 2024
|
copyright
© Royal Pavilion & Museums, Brighton & Hove
The King Alfred site c1950 |
The Nineteenth Century
The
Ordnance Survey Map of
1861 reveals that on part of this site there stood a camera obscura, an
observatory and a flagstaff. Charles Howell was responsible for the erection of
these structures and he lived on Hove seafront. (For more details, see under
‘Memorials’
St Andrew’s Old Church Hove). On the north side there was a Fives
Court where the old-time game was played in a walled court.
By the time the Ordnance
Survey Map of 1876 was prepared, the site had become a playing field used
by a boys’ school opposite in what was then known as Hove Terrace. According to
A. Fraser Taylor the field was around 100 yards long and from 50 to 60 yards in
breadth. A low brick wall topped with rounded bricks separated the playing
field from the coast road.
The 1930s
|
copyright © J.Middleton
In the left background of this postcard predating the
Great War there is a space where later the King Alfred was built. The elegant
house on the east corner of the site was called Casa Amonena (pleasant
house) and the Duchess of Sutherland lived there for a few years. The building
in the centre background is St Aubyn’s Mansions. Note the wide expanse of sand
in the foreground. |
By the 1930s the school and playing field had gone and the
site was an ugly place known as the Beach Pit from whence gravel was extracted.
Hove Council decided it was the ideal spot on which to build the borough’s new
swimming baths. The old
Medina Baths in King’s Esplanade had been in operation
since the 1890s and were considered somewhat old fashioned by the 1930s.
On 18 April 1935 the idea for new
swimming baths was placed before the Works and Improvement Committee. The Sussex
Daily News (12 September 1936) had this to say.
‘If the Hove Council wants to
celebrate Coronation Year in a really worthwhile way, they cannot do better
than resolve to deal once and for all with the unsightly gravel pit at the foot
of Hove Street. It is a blot on the fair face of the town of which it ought to
be thoroughly ashamed. The idea was put forward some time ago to build a new
swimming bath and a concert hall – but nothing has been heard of this proposal
for some months past. Something of the sort ought to be done; it would be a
magnificent opportunity.’
In fact the delay was entirely understandable because
there were several schemes under consideration and in February 1937 Hove
Council eventually approved one. Then in June 1937 there was a Public Enquiry
into the proposals and the Ministry of Health subsequently sanctioned the
scheme. Finally, there were restrictive covenants on the site, which needed to
be resolved before any work could begin.
|
copyright
© Royal Pavilion & Museums, Brighton & Hove
Excavations for the King Alfred building in 1938 |
It was not until March 1938 that
building work finally got under way on the three-acre site next door to the
RNVR depot. Messrs G. Percy Trentham Ltd, were the builders, Peterson
Engineering Company was awarded the sub-contract for water purification and
filtration work, while Messrs Haden & Sons were responsible for heating and
ventilation.
|
copyright
© Brighton & Hove City Libraries
The new swimming baths at Hove were constructed in 1938
and this photograph shows the work in progress. Note how Trentham, the
contractors, have taken the liberty of placing a large advertisement on the
wall of Casa Amonena. The building in the background is St Aubyn’s
Mansions. |
Tom Humble, Borough Surveyor of
Hove from 1929 to 1960, was the architect who designed the swimming baths. Mr
Humble lived to the age of 85 and died in the 1980s. The building was to be
called Hove Marina.
But there were further delays
before the baths were completed because of the Munich crisis, which meant some
men working on the site were drafted away to undertake work of national
importance.
Building Costs
General building work £132,000
Heating and ventilation £23,000
Filtration plant £4,000
Electrical installations £6,000
Furnishings and equipment £6,000
The total cost came to £170,000
Second World War
By August 1939 the local Press
stated a formal opening was unlikely to take place before 1940. Meanwhile, two
indoor bowling greens in the western section of the underground car park were
open. It was hoped the Small Bath might be ready by September 1939.
Instead war was declared on 3
September 1939 and on 11 September 1939 the Admiralty requisitioned the new
building, which together with the next-door
RNVR depot became an important
shore-based training ship known as
HMS King Alfred.
|
copyright © I. Hennell.
When Ian Hennell went on leave from HMS King Alfred
he
had to make sure he had the relevant Leave Ticket. |
The final handing out of
commissions took place at Hove in December 1945. After that HMS King Alfred moved
to Exbury House, the home of the late Lionel de Rothschild.
By the time the war ended, some
2,300 King Alfred-trained officers had been decorated and 600 of them
had died.
On 5 September 1945 Admiral of
the Fleet Sir Andrew B. Cunningham Bart KT GCB DSO First Sea Lord and Chief of
Naval Staff unveiled a plaque at the swimming baths – it read:
‘During the Second World War this
building was used as a Naval Officers’ Training Establishment and commissioned
as HMS King Alfred – 22,500 Naval Officers of the Royal Naval Volunteer Reserve
received their training here.’
Unfortunately, since then this
historic plaque has vanished and those in a position of authority do not seem
to be the least bothered about its whereabouts.
|
copyright © J.Middleton
This replica ship’s bell reminds people of the King
Alfred’s wartime use. |
After the building was handed
back to Hove Council, it seemed pointless to change the name to Hove Marina
when everyone had been calling it the King Alfred for years. The relevant
permission was sought from the Admiralty and the King Alfred it remained.
In August 1946 Admiral Sir G.
Layton formally re-opened the building for public use.
|
copyright © J.Middleton
The Hove coat-of-arms looks
rather splendid and redolent of civic pride. It was printed in a
sixpenny programme for the show ‘Water Fantasy’ staged at the
King Alfred
|
|
copyright © J.Middleton |
The Cunningham Hall was a
well-used venue during the winter months with dancing on Saturday nights
and light orchestral concerts. For this concert on 26 November 1950 the
well-known local band leader Sydney Sharpe conducted an augmented
Brighton Hippodrome Orchestra. Rosemary Ward, contralto, sang four
songs. Rosemary Ward was undoubtedly a busy lady because at Christmas
time 1949 she directed a programme of entertainment for guests at
Courtlands Hotel, The Drive, Hove, where she also sang on Christmas Eve
and was billed as a mezzo-contralto; for Boxing Day she and Harold Cox
provided ‘Songs from the Shows’.
|
copyright © J.Middleton
A hand coloured early1950s aerial postcard showing the King Alfred and the Coastguard Station on the left |
Special
events were held at the restaurant too. The bill of fare for this
Ladies Night in 1948 would sound very ordinary to our tastes but then
war-time food restrictions were still in place. The meal started with
tomato soup, then there was roast chicken, roast and creamed potatoes
and peas, followed by Devonshire trifle and ice cream – there was no
choice.
|
copyright © J.Middleton |
The King Alfred Swimming Baths
|
(Hove Borough’s Coronation Souvenir Programme (1953)
There was plenty of activity when this photograph
was
taken early in the 1950s. |
The main entrance was from Kingsway and led to a spacious
hall where tickets were purchased. The building contained two swimming pools.
The Major Bath was 110 feet long
and 42 feet in width; the depth of the pool was 3 feet 6 inches at the east end
while the depth was 10 feet at the west end where there was a diving board.
The Major Bath was cleverly
designed to be dual-purpose. During the winter the water was drained away and a
removable maple floor covered the area in order that dances and concerts might
be held there. In this guise it was known as the Cunningham Hall. It also
served as a sports venue where badminton was played.
The Minor Bath was 75 feet in
length and 30 feet in width. The depth of water at the north end was 3 feet 6
inches and at the south end it was 6 feet deep.
The walls of both baths were
covered in cream tiles embellished with a narrow band of green.
Bathers were obliged
to walk through a shallow foot-bath before entering either pool.
The water used in the swimming
pools was drawn from the sea by a pump capable of lifting 46,375 gallons per
hour into a settling tank of 100,000 gallons capacity. The water then passed
through the filtration and ozone plant.
|
copyright © J.Middleton
This is an example of the
entertainment once offered at the King Alfred. The dances were
arranged by Miss Doris Isaacs, and the water choreography was by Miss
Freida Bell
|
The restaurant was at the west
end of the building and it was 91 feet long and 45 feet wide and could seat 250
diners. The room was panelled in quilted maple and weathered sycamore and there
were french windows opening out onto a sun terrace. In the summer the roof
above the restaurant was used as a roof garden.
The northern part of the building
fronting Kingsway contained the private and Zotofoam baths. On the ground floor
there were 24 second-class private bathrooms – twelve for the ladies on the
east side and twelve for the men on the west side.
|
copyright © J.Middleton
A 1950s advert for the Cunningham Hall and various sporting activities
|
On the first floor there were 28
first-class private bathrooms. In all 52 bathrooms there was a choice of hot or
cold fresh water, hot or cold sea water, or Zotofoam.
|
copyright © J.Middleton
Today we take eating out for
granted, but in the lean years post-war years going to a restaurant
was something of a luxury
|
On the subject of food, it might be of interest to note what exactly
was on the menu for the Ladies’ Night of the West Hove and
Portslade Club on 7 December 1948. The fare would hardly set pulses
racing today, but at least the ladies were spared the chore of
cooking. First up was good old tomato soup, followed by roast
chicken, ‘chipolators’ (that is how it was spelt) peas and roast
and creamed potatoes, with Devonshire trifle and ice cream to finish
off.
Underground Car Park
The King Alfred was ahead of its
time in making car parking an integral part of its design. The underground car
park could accommodate 450 cars. There were also underground bowling greens.
The roof of the car park, on the east and west sides, was laid out as a putting
green.
On 26 November 1954 during a
period of stormy weather and high seas, the parapet wall was breached in three
places and sea water flooded the bowling greens and car park.
In June 1976 the Mayor of Hove,
Councillor Derek Ireland, opened a portable ice-skating rink measuring 18 feet
by 60 feet in the underground car park. Valerie Moon, the Brighton ice-skating
star, and Bill Burns owned the rink. Unfortunately, it was a short-lived
venture because the ice-making equipment was not functioning properly and the
rink closed in June 1977.
Leopold Kemp
|
copyright © J.Middleton
This remarkably clear view was posted on 1 August 1907 and shows Medina Baths & House in its heyday. |
The Baths Superintendent occupied
a flat on the second floor. Leopold Kemp was the first man to fill this role
and he had previously been Superintendent of the old
Medina Baths. Mr Kemp was
born on 8 November 1884 and he retired in November 1949, having completed 51
years of public service, first at Deptford and then at Hove. It is said he
taught thousands of people to swim during his years at Hove. He died at Hove Hospital
aged 67 on 11 June 1951.
Various Managers
After Leopold Kemp retired, Major John Buckley was
appointed manager. He was a jovial man, well known in the sporting world and
particularly amongst swimmers. During his time as manager, indoor golf and indoor
football were introduced at the King Alfred. He was also a keen bandsman,
having played the cornet in his native Manchester. It was largely due to his
influence that band concerts were re-introduced at Hove. It was a shock when he
died suddenly at the age of 50 on 24 January 1961.
Sidney Richards, who had been
deputy superintendent since 1946, was appointed manager in Major Buckley’s
place. During his time at the King Alfred there was a 25-yard rifle range and
Hove and Portslade Rifle Club used to practice there during the winter months.
Mr Richards retired in 1968.
Joseph Nuttridge was the next
manager of the King Alfred.
Tom Hallett joined the King
Alfred team in 1961 as deputy manager and twelve years later he became manager.
He enjoyed a longer tenure of office than his predecessors because he was still
there in the 1980s.
In 1985 Mr S. Muir became the new
manager.
Sea Water Baths
Surprisingly enough, the privilege of enjoying a sea-water
bath lasted until 1977 but the service was suspended from 17 August that year.
In September 1977 Tom Hallett,
manager of the King Alfred, presented a report to the Recreation and Amenities
Committee of Hove Council. He stated that there were four leaks in the sea
water piping and indeed the whole system was corroded. Added to this dismal
picture was the fact that the general public were not so keen on sea water
baths as they had been and there had been a decided drop in use. For example,
some 4,878 people had enjoyed a sea water bath in 1973 whereas by 1976 there
were only around 3,000 patrons.
New Swimming Pool
It was not only the sea water
baths that were heading for their sell-by date but also the swimming pools. In
1977 the cost of constructing a new pool was put at £1.2 million. This figure
rapidly spiralled and in May 1980 councillors were informed that the cost would
be £3,72 million while by June 1980 it was put at £4 million.
In August 1980 work started on
the new pool on the south side of the King Alfred; in December 1980 a giant
crane lifted the first roof trusses into place. There were eleven roof trusses
in all, weighing 3.8 tonnes and being 100 feet in length.
Redpath Engineering Ltd. made the
roof trusses; Scott, Brownrigg & Turner of Guildford were the architects;
and Campbell Reith & Partners from Croydon were the structural engineers
with James Longley & Co. as the main contractors.
In July 1982 it was stated that
the roof had been completed and 80 workmen were busily finishing the interior.
There was a leisure pool joined
to a 25-metre competition pool by a narrow neck of water spanned by a bridge.
There were also a teaching pool, bar, café, solarium, first aid room, and
enough seating for 240 spectators. When this new part of the King Alfred had
been completed, work could start on the second phase costing some £300,000 that
meant updating the old building. The pools would be filled in and two new
sports halls would occupy the space instead. The indoor bowls area would be
extended too.
Interlude with Dolphins
|
copyright © Photo Precision
Ltd., St Ives
Dolphins at Brighton Dolphinarium. |
In January 1983 three dolphins
from the Brighton Dolphinarium at the Aquarium took up residence in the old
swimming pool for a month while their usual home was being refurbished. The
dolphins were called Baby, Silver and Poppy and they were insured for £250,000
for the move.
In December 1990 the Dolphinarium
closed for good and the site became part of the refurbished Sealife Centre.
Public opinion had turned against the idea of dolphins performing tricks with
concerns that such intelligent creatures should no longer be kept in captivity.
The two dolphins then remaining at the Dolphinarium called Missie and Silver,
were transported abroad and eventually returned to the wild in the Caribbean in
an experiment called Into the Blue. It is not known whether or not this
enterprise was successful.
Official Opening
|
copyright © J.Middleton
The exterior of the new swimming pool was photographed
in May 2009. |
The new swimming pools were open to the public in November
1982 and customers flocked to try them out. By the end of March 1983 there had
been 145,000 swimmers and nearly 27,000 spectators.
On 14 April 1983 Neil Macfarlane,
Sports Minister, officially opened the new swimming pools. Mrs Violet Curtis of
Salisbury Road made sure she was there for the event because she also been
present at the opening of the King Alfred in 1946. Her husband Councillor Cecil
Curtis was a member of the Working Party for that building. The family
tradition was continuing because her grandson, Tony Curtis, was project manager
for the new pools.
In November 1983 the Mayor of
Hove greeted the 500,000th customer; meanwhile, additional staff
were employed to cope with the workload.
In 1985 a new slide was installed
manufactured by a Newhaven company. The 112-foot long slide had some 400
gallons of water pouring down it and was the largest in the area although there
was one similar in the Prince Regent Pool, Brighton.
In November 1986 a new slide was
opened in the leisure pool; American Express donated it as part of their
community involvement programme. The colour was bright orange and there were
two fountains cascading in an archway at the top; the steps had non-slip
treads.
New Sports Hall
|
copyright © J.Middleton
This photograph taken in July 2012 shows the east
frontage of
the King Alfred. |
The refurbished major hall was re-opened on 2 April 1984
and provided facilities for basketball, volleyball, five-a-side football and
there was enough space for five badminton courts.
The minor hall was re-opened in November
1984 and catered for gymnastics, aerobics, judo and table tennis.
The final cost of the work on the
two halls was only a little more than the original estimate, and came to
£540,000.
Tom Hallett, manager, said ‘I
believe the King Alfred is becoming one of the premier sports centres in the
south of England.’
Bowling
In September 1960 the King Alfred Lanes were opened and
became only the third civilian bowling centre in Britain.
In August 1963 Bowline Bowling
acquired the lease. In November 1982 Hove Council gave Bowline Bowling a year’s
notice to quit. In November 1983 Bowline Bowling’s lease expired and Hove
Council refused to grant a new one. This was because the cost of repairs would
be uneconomic seeing as there was a plan to re-develop the old RNVR site on the
west side. The council took the decision despite a petition bearing 5,000
signatures requesting that the bowling alley should be allowed to remain open.
By 1984 Bowline Bowling had taken
Hove Council to court in a bid to win a new lease. The developers Paradice
alleged that Bowline stood in the way of building a skating rink on the RNVR
site. In return Bowline asserted that Paradice had misled the council by
maintaining the bowling alley was the only obstacle.
In January 1985 the judge at
Brighton County Court found in Bowline’s favour. It was expected that Hove
Council would be obliged to grant the firm a new lease. But then came the
surprising news that Hove Council had acquired Bowline Bowling. The deal cost
in the region of £400,000 and Hove Council spent a further £200,000 on repairs
and improvements. On 8 January 1986 the Mayor of Hove, Councillor Bob Allen,
officially re-opened the bowling alley.
The bowling alley finally closed in July 1999 because it was losing
money.
Controversial Water Slides
On 26 November 1985 Hove Council gave its permission for
the construction of some water slides. Some 450 angry residents signed a
petition against the slides and presented it to the Department of the
Environment whose permission was needed before the project could go ahead.
Hove Council did not have to fork
out for the waterslides because Waterslides plc paid for the work. The bonus
was that the council would receive 30% of the income and after seven and a half
years, the council would own the slides.
The slides consisted of three
brightly coloured glass-fibre tunes called flumes that twisted and turned until
swimmers emerged into a covered 3-foot plunge pool. The flumes were nearly 100
yards long, 3 foot in diameter, and started around 36 feet above ground level
from an enclosed bright yellow tower that was higher than the roof level of the
rest of the King Alfred. The flumes were graded in order of difficulty. The
Black Hole was the fastest flume with the steepest drops while the blue
Aqua-jet had a sudden drop and the yellow slide, called the Twister, was
designed for beginners.
Some 240,000 gallons of water an
hour were pumped through the flumes and the water was maintained at a constant
temperature. Estimates as to how much the water slides actually cost varied;
one estimate was in the region of £250,000 while the Evening Argus (18
August 1986) put the figure at £600,000.
The tickets were not cheap
either. It cost £3-50 for an adult’s 30-minute session and £3 for a child. The
flumes were able to carry 340 swimmers an hour.
On 15 August 1986 the Mayor of
Hove, Councillor Edward Cruickshank-Robb, officially opened the water slides.
He sportingly decided to honour the occasion by sliding down one of the flumes.
Before his descent, he handed his spectacles to the Mayoral Secretary. But they
somehow slipped into the water and were later retrieved undamaged from the
filtration system.
In September 1986 retrospective
planning permission was granted for the flumes to be floodlit at night because
of safety considerations. It must be said that from the exterior, the flumes
provided something of an eyesore.
Unfortunately, there were
teething problems. The day following the official opening, a faulty pump caused
a breakdown and on 26 August the complex was closed after another pump went out
of action. All the pumps had to be replaced.
But accidents were a more
worrying problem. On the first day four people suffered minor injuries and one
boy was knocked unconscious. By September 1986 Dr Carlos Perez-Avila, accident
and emergency consultant at the Royal Sussex County Hospital, said he was tired
of treating accident victims of the flumes. By January 1987 he was writing a
detailed report on the injuries sustained, which was to be published in a
medical journal.
By the end of 1986 there had been
a total of 188 accidents reported at the King Alfred, an increase of 51 over
the previous year and it was attributed mainly to the water slides. In March
1987 it was reported that some of the victims were going to sue including a
young lady who had a front tooth knocked out while using the black slide. In
March 1988 seven people received £10,000 in compensation. The settlement was
reached without a court hearing and only after it was accepted that Hove
Council did not admit liability.
In April 1991 it was stated Hove
Council had spent more than £60,000 on updating the three water slides. But by
November 2000 the water slides were closed indefinitely because of safety
fears.
|
copyright © J.Middleton
These two photographs were taken on 8 January
2009 when a giant crane was in place to remove the controversial water slides. |
The 1980s
In 1980 Alfonso Francis Forte’s
company Solarium Restaurants leased the restaurant at the King Alfred and in
1982 leased the cafeteria too.
In 1986 the environmental health
officer was so shocked at the state of the kitchen that he closed it down
immediately. Hove Council then took responsibility for the large room and
catering facilities. The council spent £20,000 on refurbishment, including a
new floor, and in July 1987 it re-opened as the King Alfred Suite.
In September 1985 staff at the
King Alfred stopped wearing their red uniforms in favour of a new blue one
sponsored by British Telecom complete with logo advertising a sports
information line.
In November 1985 it was stated
that the King Alfred’s heating source was to be switched from oil to gas.
In January 1987 a new play
session for under-eights accompanied by adults was introduced. It included a
mini-trampoline and an inflatable full of plastic bubbles and soft balls.
In 1987 it was decided that it
would no longer be possible for swimmers to hire towels – indeed it was
surprising the tradition lasted as long as it did. The perk was becoming too
expensive and the laundry bill for towels cost £950 a year.
HMS King Alfred Re-union
|
(Hove Council)
Hove Council organised the lavish
celebrations for the Golden Jubilee Reunion. |
The 50
th anniversary
of the establishment of
HMS King Alfred was celebrated with some style
in 1989. The event ran from 31 August to 3 September and in these times of
austerity it is incredible to look back and remember the trouble, time and
expense expended by Hove Council on organising such an enjoyable celebration.
Old Salts had a wonderful time and they were full of reminiscences. Hove
Council had also undertaken to print a special edition of the booklet on the
history of HMS
King Alfred and each guest was presented with a free
copy.
The 1990s
In October 1991 police and fire officers ordered the
manager of the King Alfred Suite to make some changes in the running of the
venue. The authorities were alarmed because some parties admitted more people
than the numbers permitted; it was also a matter of grave concern that fire
exits were blocked and the illuminated exit sign was switched off.
In December 1991 nine-year old
Samantha Kinlock became the youngest British female black belt in Kwa Do
(Korean Martial Arts). She trained at the King Alfred Club.
In July 1992 the premises wee
evacuated when there was a chemical blaze alert. It seems some armchairs were
moved outside while a room was being cleaned and these were deliberately set on
fire. While the fire was being extinguished, firemen noticed that two 25kg
drums of sodium bisulphate were apparently leaking. But what had actually
happened was that an employee had placed harmless silica gel into the empty
containers. Again, fire officers were not happy.
In November 1992 David Fisher,
director, said one million people visited the King Alfred every year and it was
one of the most cost effective centres in the country. There were only two
other busier centres.
In April 1993 the Mayor of Hove,
Councillor Arlene Rowe, opened Megazone, a sophisticated laser centre with
hi-tech equipment including guns. It was the first in Sussex.
In July 1993 the main water tank
on the roof sprang a leak and around 8,000 gallons escaped. Two inches of water
covered the floor of the foyer and cafeteria and staff and firemen worked for
two hours to clear it up.
In May 1994 sporting stars
arrived to open Fitness Works, a new fitness centre at the King Alfred that
boasted the latest in exercise equipment. Amongst the sporting stars present
were Karen Pickering (swimming champion) Lyn Davis (former Olympic long-jump
champion) Nigel Gates (lightweight bodybuilding champion) and Alan Weeks
(veteran sports commentator).
In September 1994 it was stated
that the recession was starting to bite and in 1993 the fees fell by £20,000 to
£820,000.
In January 1996 it was stated
Hove Council had spent £125,000 on re-furbishing and re-designing the 13-year
old changing rooms. The firm of Braybons carried out the work.
Golden Jubilee
On 2 August 1996 the King Alfred celebrated its Golden
Jubilee. A programme of special events was organised and swimmer Karen
Pickering and boxer Chris Eubank were on hand to help with the celebrations
because they had both trained at the King Alfred.
George Carpenter was also
celebrating because he was the longest-serving employee having worked there for
33 years. He met his wife Ellen at the King Alfred and they both still taught
swimming and life-saving.
Maintenance Problems
In March 1997 it was revealed
that urgent repairs costing £170,000 were needed. The salt-laden air had broken
down the concrete and corroded the metal reinforcement. Work was supposed to
start in February 1998.
It should be noted that on 1
April 1997 Hove Borough Council ceased to be a separate entity and although the
majority of Hove residents were firmly against the idea, the Government seemed
determined it should be amalgamated with Brighton and thus was born Brighton
& Hove City Council.
In November 1999 the King Alfred
was shut for two weeks for routine maintenance. It transpired the pool had not
been emptied since 1985 although ideally it should be emptied every two years
because it was the only way to check the condition of the tiles. It was
discovered that the sealant between the tiles had deteriorated, allowing water
to seep through. By December 1999 it had become clear that around 25 square
metres of the pool base needed attention and new tiles were ordered from
Germany.
To make matters worse, on 11
December 1999 a faulty ball valve in the main water tank caused water to flood
through three floors and Hove Fire Brigade had to be summoned to pump the water
out.
It was hoped the King Alfred
would be open again for business in mid-January 2000 but it did not happen
until 17 April 2000. The cost of repairs was put at £35,000 and the loss of
revenue due to closure was put at £120,000.
|
copyright © J.Middleton
The north frontage of the King Alfred was photographed
on 26 July 2012. |
Into a New Century
In January 2001 Ian Shurrock was
appointed to run the King Alfred, having formerly been sports manager for
Dumfries and Galloway Council. In December 2001 Kerry Batten, badminton
manager, became deputy manager, having previously been assistant manager of the
Triangle Centre, Burgess Hill and before that she worked at Portslade Community
College Leisure Centre.
A major rumpus ensued when the Argus
(23 November 2001) reported that disabled parking bays at the King Alfred
car park were to be scrapped. The matter had arisen because Alexander Dodd,
retired solicitor of Shirley Drive, wrote to the council to request that the
potholes be filled in because the area was dangerous to use. He was told that
the council could not afford the £6,000 cost of repairs and they had also
decided to scrap the fifteen disabled parking bays. There was such a storm of
protest that by 3 December Sarah Tanburn, Director of Culture and Regeneration,
had ordered the potholes to be attended to and the council would worry about
finding the necessary money afterwards. It was stated that Brighton & Hove
City Council were heading for a deficit of some £5 million.
Re-development Schemes Come and Go
|
copyright © J.Middleton |
|
copyright © J.Middleton
These two illustrations show how much the west part
of the King Alfred site has changed over the years. The lovely old
postcard view is completely different from the modern view taken in 2009
and the only constant between the two is the iron railing on the right. |
Originally, the King Alfred and its next-door neighbour,
the RNVR site, were separate entities except during the Second World War. The
situation changed in 1968 when Hove Council purchased the site from the
Admiralty but it has remained empty ever since except for car parking.
From that date there have been
various schemes to develop the area up to the present day and the fate of the
two sites has become inextricably entwined. It therefore seemed logical to
group all the plans under the King Alfred Site heading although to be
absolutely correct some of them should fall under the banner of the RNVR site.
First Airing of a Multi-Flat Plan
In 1971 Hove Council came up with the idea of a ten-storey
block of 70 flats and four penthouses. A few sporting activities were included
in the scheme such as a table tennis room, squash courts and an indoor bowling
rink. There was a Public Enquiry after which the plans were thrown out. The
Secretary of State declared that any building on the site should not exceed the
height of the King Alfred; he also considered the height of the building would
ruin the sea views from the north.
Perhaps a Hotel?
In 1981 there were plans for a hotel some 200 feet in
height, together with a health club, restaurant, nightclub, shops and a pub.
The plans never became public because the scheme was still at the discussion
stage when the recession intervened and nothing became of it.
Why Not a Private Hospital?
In 1983 an ambitious plan was mooted for a private hospital.
Hove architect Christopher Dodd designed it for Bill Skinner, owner of a rest
home in Sackville Gardens. The £5 million scheme envisaged a seven-storey high
building boasting a raked design in order that every bedroom could enjoy a sea
view. There would be 119 beds and an underground car park for more than 100
vehicles.
But Bowline Bowling Ltd. who ran the ten-pin bowling alley
and would be affected by the building plans, vowed to fight the scheme.
The Hove Labour Party attacked the plans asserting it was
‘totally immoral to use public land for a private hospital’.
In April 1983 Hove Planning Committee threw out the
scheme.
A Paradice Plan
In 1984 a new plan was aired. Paradice put it forward with
Roger Pell-Stevens being the architect. An international-sized skating rink was
envisaged with the structure being steel and glass arranged in a series of
pyramids to allow adjacent flats to keep their sea views.
A Planning Brief
In July 1986 Hove Council produced a Development Brief in
which they stated they were prepared to accept a tall building on the site
providing it was slim and elegant. But the following month it became clear
prospective developers were deterred by the obligation of having to provide a
car park with at least 250 spaces.
In their desperation to see the site properly developed
Hove Council even went so far as to consider the use of number 1 Western Lawns
on the west side of Lower Hove Street as a possible car park.
In April 1988 Hove Planning Committee voted 5-4 in favour
of a new scheme going ahead that involved an eight-screen cinema, a restaurant
and a nightclub.
Citygrove 1
In April 1989 Hove Council granted a three-month option to
Citygrove Developments in order for them to work up full details of their
project; this included a leisure ice-rink, a 30-lane ten-pin bowling centre, a
family restaurant, a themed café and a car park for more than 400 vehicles.
The plans were unveiled in November 1989. But neither the
Fine Arts Commission nor Hove councillors liked the proposed skyline details
that included replicas of Olympic torches; disgruntled councillors thought they
looked more like giant ice-cream cones.
Alternative designs were considered in light of the
criticism. The development was due to start being implemented in February 1990
but in the previous month Citygrove decided to pull out because the recession
meant there was a slump in the institutional funding market.
Citygrove 2
In August 1998 Citygrove unveiled a different plan to
develop the King Alfred and RNVR sites with the exception of the swimming pools
and underground bowling, which would remain council property.
The scheme included restaurants, a casino, and nightclub
and a 13-screen cinema complex. There would be 550 car parking spaces on two
levels below the centre. A family entertainment centre was also envisaged with
children’s activities and virtual reality attractions.
Some sporting activities would be displaced and
transferred to the proposed new community leisure centre next to Blatchington
Mill School.
The scheme was expected to cost £30 million. But there was
widespread opposition. Councillors feared it would generate too much traffic
while residents of Viceroy Lodge and other neighbouring properties were against
it too. People were so angry the council only proposed to give the public three
weeks in which to air their views that the consultation period had to be
extended.
If the scheme went ahead, six badminton courts would be
lost and there would be no more table tennis, snooker or pool while the ten-pin
bowling alley would close. Hove Boxing Club might have to shut and Cheetah’s
Gym wondered what would happen to them. Then there were Olga and Philip Millard
who ran Olga’s Dance Club and did not know where they would be able to find a
comparable ballroom.
However, Ivor Caplin, Hove’s MP, supported the scheme
because ‘it would breathe new life into a part of Hove seafront, which has
suffered from under-investment for too long’. The brothers, David and Martin
Collinson who ran Megazone, were also in favour because they thought the King
Alfred had been an eyesore for some twenty years.
But the Royal Fine Arts Commission, English Heritage, and
the council’s own architects all had their reservations. Citygrove was asked to
reconsider their plans.
Citygrove 3
In April 1999 new plans were produced. The cinema complex
was cut from 3,400 seats to 2,650 and there would be six screens run by Virgin.
Lord Bassam made a memorable statement in which he said he found the project
very exciting and Hove would have its first-ever cinema. This provided ample
fuel for the letters page of the Argus from people who could remember
Hove’s five cinemas perfectly well.
The family entertainment centre, amusement arcade and
nightclub were all dropped from the new scheme. But the Casino remained and the
Grosvenor Club from Fourth Avenue would occupy it.
The existing swimming pool would be re-vamped and the
council would build a new sports hall at a cost of £6 million. The hall would
have enough space for six badminton courts and would be equipped to provide
basketball, volleyball, five-a-side football, trampolines, table tennis,
gymnastics, judo, karate, archery, cricket, fencing and roller skating. In
addition there would be a health and fitness studio. The ten-pin bowling alley
would be retained.
The height of the buildings was reduced and the number of
parking spaces lowered from 550 to 492. The frontage to Kingsway was
re-designed and a restaurant was included.
But Paula Jones, spokeswoman for the King Alfred Action
Group, said the complex was still far too large. On 24 May 1999 there was a
three-hour public meeting at Hove Town Hall. Henry Hertzberg of architects
Chapman Taylor said they had tried to take public concerns into account but
angry residents labelled the plans as ‘a catastrophe waiting to happen’.
In June 1999 Citygrove stated that from the 14,500
questionnaires sent out, residents had voted 3-1 in favour of the development.
A council survey of the four seafront wards showed people were in favour 2-1.
But the protesters continued with their campaign. They
feared that a site that belonged to the people might be sold off to some
get-rich merchant and in July 1999 the council refused to reveal details of the
lease.
The council again deferred a decision and called upon
Citygrove to produce leisure impact and traffic reports.
Meanwhile, in July 1999 it transpired that over the
previous five years the number of people using sports hall and gym had fallen
from 67,000 to 59,000.
Citygrove 4
By August 1999 the plans had been revised yet again. The
west end of the structure would now be two-storey instead of three-storey; the
exterior would have a lighter feel because it was proposed to use steel and
glass instead of a rendered surface. There would be a single entrance to the
sports hall and the main entrance to the cinema would be at pavement level,
thus improving disabled access. There would be a café and terraces overlooking
the sea on the west and south sides. Car parking would only be on one floor. A
new green bowls centre was also proposed plus a re-vamped swimming pool.
The council approved the scheme on 30 September 1999 after
a two-hour debate with a vote of 7-5. Citygrove agreed to a £40,000 package to
assist local traffic schemes and they were prepared to sign up for a two-year
agreement with Brighton & Hove Bus Company to extend their services to King
Alfred.
In November 1999 the Government approved the scheme after
John Prescott, Environment Secretary, decided not to intervene. The scheme received
474 letters of approval and 369 letters of objection.
Then the whole outcome was thrown into confusion when Rank
Leisure and their development partners, Gallaghers, decided to apply for a
judicial review. Rank Leisure owns Odeon cinemas and they planned to spend £10
million on a ten-screen multiplex at West Street, Brighton, and naturally it
would be financially sensible for them not to have rivals in the vicinity.
Rank’s principal argument was the council had not paid enough attention to a
Government planning guidance note laying down that major leisure centres should
be located in town centres wherever possible. The council were obliged to take
legal advice and it was recommended the scheme should go back to the planning
committee. Meanwhile, the judicial review proceedings were halted.
Citygrove 5
Brighton & Hove City Council approved new plans in
June 2000. But there was still some opposition and the following month Tory
councillors asked John Prescott to hold a Planning Enquiry but he refused to do
so. In July 2000 Citygrove signed a deal with UGC (formerly Virgin) to run the
multiplex cinemas and Toby Baines, Citygrove director, said he hoped work would
begin in January 2001.
Meanwhile, doubts were being raised about Citygrove’s
viability. Tory councillors discovered Citygrove had donated £2,500 to the
Labour Party every year since 1995. There was also the fact that Citygrove had
an exclusivity agreement with Labour-run Brighton and Hove City Council. Then
it transpired that Citygrove had not filed a full set of company accounts since
June 1998. Adam Millward from Grand Avenue, Hove, pointed out that Citygrove
only had five employees, zero credit rating, and two companies in receivership.
By November 2000 the whole scheme had collapsed like a pack
of cards. A crucial factor was Grosvenor Club’s decision to withdraw from
running the planned casino.
Citygrove had to produce revised plans just for cinemas
and restaurants on the RNVR site while making a token money gesture towards the
re-development of King Alfred. The council turned down the proposals because
they felt the venture was far too risky. Thus, after five years of numerous
discussions, meetings, revised plan after revised plan, the council had
precisely nothing to show for it.
What Next?
On 20 November 2001 there was a crowded meeting at
Hove Town Hall where Ken Burlton, sports consultant, outlined his ideas for a new
development at King Alfred. They included improving the existing swimming
pools, building a new sports hall, providing amenities for children, and
re-building an indoor bowls centre. There was a possibility of a new gymnastics
centre too.
The scheme would cost at least £15 million and while there
might be £2 million forthcoming from the National Lottery, there was little prospect
of additional grants. There would have to be some commercial development to
make the scheme viable. The number of people using the facilities at the whole
of King Alfred had fallen from 900,000 in 1992 to 300,000 in 2000.
In January 2002 the council stated they were considering
three options; to build from scratch, to re-furbish the existing building, or a
combination of the two. But by the following month it was obvious it would not
be that simple. It would need at least £16 million to regenerate the area and
the best way to acquire money would be to allow developers to build homes on
part of the site. But there was a drawback because the council had a policy of
ensuring that 40% of a new development would be affordable housing.
By May 2002 the council stated a new sports centre would
cost £20 million. A consultation leaflet presented the public with three
options for them to consider but all of them included the provision of flats.
Option one – 300-400 flats
Option two – 300-350 flats
Option three – 275-325 flats
‘Some choice!’ as critics remarked. The buildings would
rise to four or eight stories. Needless to say immediate neighbours were
appalled.
In July 2002 Brighton and Hove Policy Committee agreed in
principle to rebuild King Alfred and to allow up to 400 homes to be built on
part of the site. But for this to happen the Local Plan would have to be
altered because the site was earmarked for sport.
Liberal Democrat councillors challenged the committee’s
decision and leader Paul Elgood said ‘ We believe the Policy Committee acted
illegally by setting off the process for changing the Local Plan without the
consent of full council. The council’s constitution does not give the committee
the power to do this… (The King Alfred) is a relatively small site and every
inch of it is needed for the kind of sporting development Brighton and Hove has
long been lacking.’
Then Brighton & Hove City Council brought out its own
planning brief and admitted the 1995 Hove Borough Local Plan still technically
covered the site. Therefore, a new Brighton and Hove Local Plan was necessary,
which was currently at the second deposit planning stage. There would be a
Public Inquiry into the new plan starting in September 2002 that would probably
run into 2003. However, neither of the plans recorded a specific policy for the
King Alfred site, only for the RNVR site.
The Gehry Towers
This most controversial of schemes was also known as the
‘Four Maidens’ or if you could not stand the design ‘Tin Can Towers’. The plans
also had the bonus of being designed by an internationally known architect and
it was to be his first major building project in England although he had
designed the Maggie Centre in Dundee. Frank Gehry’s most notable works are the
titanium-covered Guggenheim Museum in Bilbao, Spain and the Disney Concert Hall
in Los Angeles. But his National Building in Prague with its ‘wonky’ towers
design does bear some resemblance to his Hove design.
The plans were revealed to the public in July 2003 and the
‘Four Maidens’ – supposedly inspired by the flowing dresses of Edwardian ladies
promenading on Hove seafront and lawns – consisted of four 38-storey towers
with the swimming pool and sports complex at the centre.
|
copyright © J.Middleton
Frank Gehry said he was inspired in his design for the
towers
by the flowing dresses of Edwardian ladies promenading. |
Ken Fines, Brighton Borough Planning Officer 1974-1988,
born, bred and resident in Hove, was so horrified at the plans that he set up
campaign group HOVA – standing for Heritage Over Vandalism Actually and Hova
was the Latin for Hove.
Ken Fines was not the only protesting voice of course and
by January 2005 new plans were on the table. The ‘Four Maidens’ had gone in
favour of two 18-storey towers plus six to eight 10-storey blocks. It still
made for a very crowded and overpowering design.
The trouble with providing modern sporting facilities is
always going to be the huge cost involved. In the King Alfred’s case this was
to be covered by building flats for sale. But planning restrictions meant they
could not all be luxury apartments and some must be for social housing. While
laudable in social terms, it meant there would be less profit for the
developers and therefore a finer line between triumph and disaster. Karis Holdings were the developers behind
the project. Karis Holdings was a ‘joint venture company between local
developer Karis developments and ING Real Estate Development UK, the property
development arm of the Dutch global financial institution.’
By August 2005 Karis was hopeful enough about the project
to spend some £170,000 on a huge drill to find out the structure of the soil
they would be dealing with and how much concrete would be needed. The drill was
set up in the west corner of the car park and took samples to a depth of 40
metres and the experts pronounced the subsoil was fissured chalk. The towers
would be supported on a 3-metre thick concrete platform. The platform in turn
would be supported by up to 300 columns made of concrete measuring a metre in
width and the length being up to 40 metres.
A letter from Dr Geoffrey H. Baker published in the Argus
in December 2005 suggested ‘we have to live with architecture for a long
time but modern architectural fashions change rapidly and some would argue
Frank Gehry’s concepts are already passé.’ The Architects’ Journal (November
2008) was similarly unimpressed. It mentioned the ‘fortress-like engagement
with the street’ and the ‘depressing-looking’ perimeter blocks ‘crammed full of
single-aspect flats’ that were ‘cheap and nasty’.
In September 2005 Brighton & Hove City Council voted
for the scheme to go ahead. The following is a list of what the development
involved:
25-metre eight-lane competition pool
20-metre teaching pool
Leisure pool for under-eights
Sports hall the size of 8 badminton courts for a range of
sports including basketball, five-a-side football and volleyball
Multi-purpose sports hall suitable for table tennis,
martial arts and fencing
Gym
Workout studio
Sauna
Steam room
Showers and relaxation area
Consultation rooms for sports injuries, massage,
complementary medicine
754 ‘unique and beautiful homes’ created in
Blocks of 8 to 11 storeys
Two towers of 21 and 25 storeys
472 apartments for sale
282 affordable homes
However, a six-rink indoor bowls centre would not be
provided within the King Alfred but somewhere else within Brighton and Hove
On 11 November
2008 the dream died with the Argus headlines declaring ‘King Alfred is
dead.’ The development agreement between council and developers was signed in
November 2004 and expired on 9 November 2008.
The rot started in 2008 when ING withdrew their financial
backing due to the recession; apparently, the fall in house prices rendered the
scheme no longer financially viable. Naturally, Karis wanted to try and protect
the money already invested in the scheme and struggled along hoping to save it.
It is understandable when you consider they had spent six years and £13 million
in trying to bring the plans to fruition. Indeed, despite the November
announcement Karis still hoped the scheme might go ahead in another two or
three years when the economy had recovered.
The collapse of the Gehry Towers left Brighton & Hove
City Council uncomfortably holding the baby. Nothing had been spent on
maintenance at the King Alfred because its demolition was expected to be
imminent. It left the council needing to spend £1.5 million just on keeping the
place up and running. This was an underestimate because in June 2010 it
transpired some £2.25 million had been expended.
|
(Karis /ING)
This illustration was printed in a newsletter widely
distributed to the local population. It shows the final amended scheme with two
towers and not four. |
Freedom Leisure
Freedom Leisure is a trust established in 2002 that by
2010 was responsible for running eighteen facilities in Sussex. In December
2010 Brighton & Hove City Council decided that Freedom Leisure would also
run the King Alfred with a contract running from April 2011 to 2021 but with a
‘get-out’ clause in case a new development idea came over the horizon.
The Way Forward
In April 2012 it was revealed that the council was to
spend some £40,000 in setting up a project team to look into future options for
the site.
In August 2012 two interesting nuggets of information came
to light. Rob Starr, boss of an insurance company, revealed he had a £150
million funding agreement with a large Sussex contractor to demolish the King
Alfred. Starr then planned to build a performing arts venue to include 12 dance
studios, 8 rehearsal rooms and 2 theatres.
Meanwhile, the Government had given permission for a new
Christian Free School to be established in Brighton and Hove. The school’s
backers stated that the King Alfred site was their preferred option and there
should be shared leisure facilities. In the event the school, named King’s
School, opened at Portslade on a site long associated with education; it used
to be a Sixth Form College operated by Portslade Aldridge Community Academy,
formerly, the Lower School of Portslade Community College; before that it was
Portslade Boys’ School and its first use was by
Windlesham House School.
Starr Trust / Crest Nicholson - King Alfred Project
In January 2013 the Argus stated it knew at least
five groups who had expressed an interest in developing the King Alfred site.
Bur Rob Starr said that some 75 developers were initially interested in the
site.
By December 2014 two companies were on the short list.
They were French-based Bouygues Development and Crest Nicholson Regeneration in partnership with Hove
businessman Rob Starr, co-founder in 2008 of the charity Starr Trust, set up to
honour his late father. It seems that Rob Starr had a more personal take on the
King Alfred because he had used the swimming facilities since he was an
18-month old baby.
On 8 January 2016 Brighton and Hove Independent revealed
the members of the cross-party King Alfred Project Board were Councillor Warren
Morgan (Labour) Councillor Robert Nemeth (Conservative) and Councillor Tom
Druitt (Green).
They had been involved in discussions behind closed doors
for months. But the secrecy did not go down well with the general public or
some other councillors for that matter. It is such an important project
expected to cost almost £400 million and ordinary folk felt there should have
been much more transparency. It is also seems probable that the designs
submitted by the losing bidder would never be made public.
Indeed, Councillor Nemeth stated that he had been firmly
in favour of public consultation before he even joined the Project Board when
he was working with Mike Weatherley M.P. to get the project off the ground. He
said that not consulting the public and the people who actually used the King
Alfred centre was a grave mistake. It only led to negative publicity and upset
after the plans were announced and it could have been so easily avoided.
On 21 January 2016 the Policy and Resources Committee
stated their preference for the Crest Nicholson / Starr Project.
London-based Haworth Tompkins is the lead architect for
the scheme while Lewes-base LA Architects will design the sports centre.
The sporting facilities would include
Competition pool 25m x 8m lanes
Teaching pool, 20m x 10 m
Leisure pool for under-eights, 400 square metres
Badminton – eight courts
Gym – with 120 pieces
Gymnastics centre
Martial Arts training room
Workout studio – for classes of up to 35 people
Quiet activity studio – for classes up to 12 people
One multi-purpose room – 22m x 12m
Indoor bowls – three rinks
Health and fitness changing
Sauna – for eight people
Créche for under-fives
Soft-play room for up to 72 children
Café
Car park – 200 spaces for sport and leisure use
While all this is fine and dandy, the visual impact of the
development from the outside is proving to be far more controversial. The
architect also uses the old trick of portraying the development from the sea
and a nice stretch of blue sea softens the starkness of the box-like towers. In
reality, how many Hove residents ever have the opportunity to view the seafront
from a boat? The flats are necessary to finance such a major project and there
will be 560 homes. But did the towers have to be so totally uninspiring? The
headlines in the Argus 4 February 2016) ran King Alfred: it has to be
better than this.
The editor of the Architects’ Journal stated ‘This
is solid dependable architecture by a solid, dependable architect’. But is it
relevant in its context? Fortunately, there will be public consultation and no
doubt the plans will be tweaked during the course of the year before planning
permission is granted.
A sense of urgency was generated on 8 February 2016 when
Storm Imogen blew off parts of the rood covering the King Alfred swimming pool
and the centre had to be closed.
In April 2016 the Argus published
a hilarious spoof for April Fool’s Day. It was an impression of new
plans for flats on the King Alfred site, which showed a structure rising
up like a tumbling stack of books. One wag wrote in to say he would
have the penthouse and then when he wanted to go to bed, he could just
slide down the slope.
On 16 May 2016 the swimming baths were at last re-opened after storm damage earlier in the year.
Still on Track
In Brighton & Hove Independent (19
July 2016) developer Ron Starr was keen to emphasize that the King
Alfred project was still on track. He had expected there would be a year
of consultation starting this September and he hoped builders would be
on site by October 2017. Although the Brexit vote had caused jitters in
the construction industry, Starr stated that Crest Nicholson was now
rallying. Starr also provided a fascinating insight into tough business
practices. Initially, he had approached French construction company
Bouygues as a possible commercial partner because he had worked with
them before. Then he discovered that Bouygues was putting in a bid on
their own account and without him. Perhaps it was poetic justice that
Starr won the contract after all.
A Hitch
Many people were not surprised when the Argus (27 September 2016) announced there would be a six-month delay in implementing the £166 million project. Apparently, the hitch was due to ‘legal, financial and contractual issues’.
Rob Starr, the man behind the winning bid, was very disappointed by the delay. As he pointed out the contract was awarded in January and now it was September and nothing had happened.
Robert Nemeth, Hove Conservative councillor, was also bothered by the news. He said ‘On top of the secrecy that the public has had to endure, there are now delays … The Labour administration will have a lot to answer for if progress is not made sharpish.’
The comment column of the Argus revealed a most telling comment made by Warren Morgan, council leader. He admitted the project was chosen for its affordability and not on architectural merit.
Death Knell?
In the Argus (19
August 2017) there was a dramatic two-page article with banner headline
‘Developers want £10m more of taxpayer’s money for King Alfred’.
Brighton
& Hove City Council are already committed to contributing £8
million of public money towards the scheme. Now Crest Nicholson is
attempting to re-negotiate terms stating the project is unviable due to
rising costs.
The
scheme is already trailing behind schedule because the leisure centre
was supposed to be finished and open to the public by the close of 2019.
Current thinking place the completion date at a more realistic time in
the years between 2022 and 2028.
But the public planning consultation has not even taken place yet although that was supposed to happen in the summer of 2016.
Robert
Nemeth, Conservative Counsellor, said ‘The mistake ultimately was
picking a competition winner that was unable to deliver the project and
then not putting mechanisms in place, such as a deposit, that would hold
Crest Nicholson to its promises.’ Mr. Nemeth added that there was
nothing the Council could do to make the company start work and he
doubted it would go ahead.
Valerie
Paynter,
SaveHove campaigner, thought the biggest problem was the
housing estate and the Council is ‘just desperate to deliver that great
big wodge of housing the Government is forcing down the city’s throat’.
There are many campaigners who think it would be best to ditch the whole thing and go back to square one.
On
the other hand a spokesman for Crest Nicolson and the Starr Trust
stated they are committed to delivering the King Alfred development.
Surprising News
On
1 February 2018 there came the unexpected revelation that the
Government was prepared to pledge the sum of £15 million in order that
the scheme might go ahead. This followed the belated realisation of the
acute housing crisis prevalent in most parts of the country and
therefore the Government pledged to build some 200,000 houses
nationwide.
It
was an excellent piece of news to developers Crest Nicholson, The Starr
Trust, and Brighton & Hove City Council who, in November 2017, had
applied for a £15.2 million grant from the Marginal Projects scheme; the
developers were struggling to fill a funding gap in the £200 million
project, and in particular, the money necessary to build the required
level of affordable housing.
Scott
Black, managing director of Crest Nicholson Regeneration, said he was
delighted and stated the project could now progress quickly. Rob Starr
of The Starr Trust was thrilled, and Warren Morgan, council leader, was
‘massively pleased’. (
Argus 2/2/18 /
Brighton & Hove Independent 2/2/18)
Brexit
Crest Nicholson were supposed to have signed on
the dotted line by Wednesday 24 November 2018. Perhaps it was no
surprise to weary observers that the deadline came and went with the
document remaining unsigned. Councillor Robert Nemeth said the scheme
‘was falling apart in front of our very eyes’. He also commented
that should the plans not go ahead, the administration would have
wasted in the region of £4 million. A new deadline was set for 31
January 2019.
Brighton & Hove City Council had already made
a major concession by not insisting on its own rules that new
developments should include 40 per cent of social housing. Instead,
Crest Nicholson would be allowed to get away with providing only 20
per cent of social housing in the King Alfred development.
In December 2018
Crest Nicholson informed the council that there was still a funding
gap of £16 million – this was despite help from the government and
the council. In its defence, the company stated they had already
spent some £1 million, and they were still committed to the £400
million scheme. They then wheeled out the old chestnut of Brexit,
citing the uncertainty it was causing. The council agreed to push
back the deadline (again) to the day after the Brexit date of 29
March 2019. But there were some councillors and many people who
thought the whole thing would have to be abandoned – back to the
drawing board. Meanwhile, the French company was showing a renewed
interest. (Argus 1/12/18
– 8/12/18 – 26/1/19)
Withdrawal
On 14 August
2019 the giant headlines in the Argus
were
‘£400M Plan Sinks’ with the ‘sinks’ in red letters. It was
announced that Crest Nicholson were pulling out of the King Alfred
Project. There cannot be many people who were surprised at the news
because it had seemed like a foregone conclusion for months, and
indeed Councillor Robert Nemeth had predicted such an outcome two
years previously. The company stated that ‘the ambition of the
scheme in these uncertain times was too great’. Naturally enough,
Brexit was cited as a cause, but the company also said it could not
afford to build any affordable housing at all. Brighton & Hove
City Council’s basic policy was that new developments should
include 40 per cent of affordable housing for which there was a great
need. The council had already reduced this requirement to 20 per cent
to help the scheme along.
The reaction of ordinary citizens to news of the
collapse was – what a monumental waste of time, money and effort!
The setback must also be judged against the i360 difficulties where
money owed to the council has not been forthcoming. Increasing
domestic rates, and high business rates in particular, are a sore
point, especially when the council appears to be wasting the revenue.
However,
the very next day (Argus
15
August 2019) Rob Starr announced that he had already found a new
developer to take on the project instead. But he would not disclose
the name. Peter Kyle, M. P. for Hove & Portslade, was keen for
the development to go ahead, and would be meeting council bosses in
September.
Still There in 2023
In
January 2023 there came the depressing news that the swimming baths
would be closed until Easter. The place is run by Freedom Leisure on
behalf of Brighton & Hove City Council. It is not the usual case
of lack of money, but the irreversible fact that the 40-year old
boilers have simply given up the ghost. Of course in terms of a
leisure centre, the building is positively antique, having been
constructed in 1939; nobody expected it to still be in use at this
late date, and therefore maintenance was not always given top
priority. Major repairs are now necessary but the place is still
‘very well used’. The article was accompanied by a dismal photo
of behind-the-scenes interior with its large pipes.
The
closing paragraph stated that work on the project for a new centre
was not expected to start until 2025. That seems an optimistic
timescale to say the least. (Argus
20/1/23)
Here We Go Again
On 18 April 2023 initial plans for
a new King Alfred Leisure Centre were revealed. It is astonishing to
note in these times of austerity that the plans were somewhat
ambitious with the intention of raising the ‘city’s profile as a
destination for sports.’ The proposals include the following:
An eight-lane 25-metre competition
swimming pool
An eight-court sports hall
An interactive cycling studio
350 spectator seats
On-site parking
‘Some element of leisure water’
The last phrase is rather
appealing but whatever does it mean? Perhaps a quick dip in a small
pool for ordinary folk?
An estimate of up to £50 million
was mentioned. Most probably an underestimate. But ever hopeful, it
was expected that some of the cost would be offset by a housing
development. Naturally, a ‘comprehensive business case’ was being
built up.
The
main trouble is that it is not quite clear where the new King Alfred
would be situated. Obviously, the old King Alfred would have to be
demolished, but if the new centre were to be placed there, it would
mean current bathing facilities would be lost for years while it was
being constructed. At least the council own the land, and perhaps the
new complex could be built on a part of the existing site while
leaving the old King Alfred in
situ
until completion. The possibility of other sites, either
council-owned or privately-owned would be explored, but no doubt
would produce other difficulties. (Argus
19/4/23)
Are the plans viable? And is it
just a coincidence? But just days later, and after a bare minimum of
public consultation, the plans became part of the Manifesto issued by
the Green Party in preparation for local council elections on 4 May.
More
details became apparent a few days later. For example it was stated
that it was likely the old King Alfred would be demolished before the
new facility was built, and never mind where the new structure might
be situated. This was because the permanent closure of the King
Alfred is becoming more likely due to worn-out aspects of the
building and equipment. Indeed, instead there is the horrible
prospect of at least 400 apartments arising on the site after the old
building had been knocked down. (Argus
25/4/23)
On 4 May 2023 local council
elections were held. It remains to be seen exactly how the new
council will approach the King Alfred scheme. The make-up of the new
Brighton & Hove City Council has changed completely. Gone is the
Green Party’s dominance, they being left with precisely seven
councillors, whilst the Labour Party had 38 councillors, the
Conservatives six, Brighton & Hove Independents two, and finally
one Independent for Portslade North.
Residents are being asked to
share their ideas about what a future King Alfred should contain, and
some 200 people turned up at a drop-in event. Not surprisingly, there
was support for a competition-sized swimming pool, an updated gym, as
well as a space for dance classes and martial arts. A popular request
was that there should be more facilities for those with disabilities,
and activities for children. Altogether, there were at least 500
suggestions.
Councillor
Alan Robins was pleased that so people had taken the trouble to share
their thoughts, and that there would be many more opportunities for
the public to have their say over the coming months. However, there
was no con-census about where the new King Alfred should be built,
while some opted for the seafront, others thought it would be better
off to the north of Hove with better links to public transport,
walking routes, and schools. Later on in the year site options would
be explored, and hopefully a shortlist of three possible sites
suggested. (Argus 5/6/23)
Is
History Repeating Itself ?
Later
in June 2023 there came the devastating news that the much-vaunted
Kingsway-to-the-Sea, right next to the King Alfred, was to be put
‘on-hold’. This was because the agreed plan would now cost £16
million, instead of the £9million already in the kitty. This was in
addition to the £3.02 million overspend left by the out-going
council, not to mention the on-going debt accrued by the i360. In
other words, where would the money for a new swimming pool come from?
Early
in July there came reports that the King Alfred was infested with
cockroaches. This was by no means a new occurrence because there has
been a cockroach problem for some years, it having been reported in
2013. It can be off-putting for putative swimmers to glimpse them
scuttling about in the changing rooms. A disgruntled whistle-blower
and former employee stated that the King Alfred was an ‘old and
decaying building that needs knocking down.’
The
King Alfred is currently run by Freedom Leisure, and the council
would be contacting them to report back on their pest control
measures. Ominously, the Argus
reported
that the council has confirmed the building will ‘very likely’ be
demolished without regard as to where a new swimming pool might be
built. If that happened, some 400 apartments would be built on the
King Alfred site. (Argus
10/7/23)
More
bad news was announced the very next day when it appears that the
outgoing council drew up a budget for the next financial year
2023-2024 that would have landed the city with an £11million
overspend. There will certainly be major cutbacks now. (Argus
11/7/23)
What We Have Lost
It might be nostalgic, but also terribly sad to
recall how important the old King Alfred was in the past. In 1950 it
was described, not surprisingly, as ‘The Sports and Recreation
Centre of the South Coast;’ the following lists what was available.
Swimming pool (heated sea water)
Badminton (5 courts)
Boxing Club
Cricket Nets
Fencing
Football Practice Net
Golf Practice Net
Indoor Bowls (4 rinks)
Rifle Range
Table Tennis
Not to mention popular Saturday night dances.
A New King Alfred?
In
January 2024 it was reported that the council had taken note of ten
potential sites for the new swimming baths and had slimmed the list
down to two. The possible places were to use the present King Alfred
site or building on land north of the Old Shoreham Road, and south of
of the car park at West Hove’s Sainsbury’s. Reading between the
lines, it seems the council would prefer the latter because the old
King Alfred site would entail too many challenges. However, the
alternative site is also problematic because it is at present the
cricket ground where Portslade Cricket Club play their matches. There
is also the thorny problem that the new baths would destroy a
designated green space, and there is the question of a restrictive
covenant as well.
The
public are invited to express their views, either on the council’s
website or at public meetings as follows:
16
January at the King Alfred Leisure Centre
17
January at St Richard’s Community Centre, Egmont Road
17
January at Portslade Library, Old Shoreham Road
24
January at Hove Library, Church Road
As
ever, it seems the public involvement will be of very short duration,
especially since building work is scheduled to start in 2025. (Argus
11/1/24)
By
the end of January, it seemed that Benfield Valley was the preferred
site. One Hangleton resident expressed surprise that the council
originally said there were twenty possible sites, and yet within a
short space of time and a few hasty consultations, the council had
narrowed it down to just one. (Argus
31/1/24)
It
is fascinating to learn that there is a new group called ‘Keep the
King Alfred on the Seafront’. Several of them made a close
inspection of the outside fabric of the building on Sunday 11
February 2024, and some interesting views were expressed. Although
the place has been woefully neglected for years, the actual brickwork
is in very good condition with perhaps a bit of re-pointing necessary
in some places. The real trouble rests with the cast-iron pipes,
which are broken or cracked, and have not been replaced, and so of
course some damp has crept in. (Argus
13/2/24)
It is
interesting to note that more than 3,500 people have responded to the
council's invitation to express their views on a new King Alfred. (
Argus 23/2/24)
There was an astonishing development when the cash-strapped
council suddenly announced that £800,000 would be spent on the
present-day King Alfred to keep it viable for the present, and the
work will not be completed until September. Some interesting
statistics were also revealed - that each month more than 17,000 swim
visits are recorded while 1,200 children are being taught to swim.
(Argus 19/3/24)
Helmut Lusser, chair of Hove Civic
Society, wrote some sensible comments in The
Hovarian (April
2024). He was amazed that in its deliberations on a site for the new
King Alfred, Hove Council had apparently ignored the new Hove Beach
Park being rapidly developed right next door to the present site of
the King Alfred.
It would surely be logical to
build the new King Alfred near such a modern attraction, and all in
all it would make a wonderful choice of sport and activities and
leisure all in a single setting, not forgetting the proximity of the
sea, or as the modern jargon has it ‘a multi-sports hub’.
Moreover, the King Alfred could be built on a brownfield site next to
the present site, thus preserving precious green space in Benfield Valley.
Final Decision
On 18 July 2024 in a council
meeting at Hove Town Hall a final decision was made to build a new
swimming pool actually on land next to the existing King Alfred site.
The news was very welcome but also something of a surprise because
previously councillors had seemed to be so set on building it in
Benfield Valley.
But the council was able to
produce approval for their decision from the fact that out of the
people who had responded to a request for their views, only 14 per
cent had opted for Benfield Valley whereas 60 per cent had plumbed
for the King Alfred site.
However, the real fly in the
ointment was the covenant to protect Benfield Valley from being built
upon. Legal advice was that it would take a great deal of time and
money to try and overthrow the covenant in the courts of law, and
moreover there was no guarantee of success.
The
new swimming pool could end up as £47 million project. Part of the
cost could no doubt be offset by selling unused land for
house-building, selling properties and government grants. The next
step is to appoint an architect to come up with some plans. (Argus
23/7/24)
The Saga Continues
Brighton
and Hove City Council now operate under a cabinet system – it is
supposed to be more efficient. But the reality is that major
decisions are taken by a few councillors that leave other interested
councillors out in the cold and fuming because they have not been
allowed to scrutinise relevant information. The decision taken by the
cabinet prompted seven councillors (Green and Conservative) to call
another meeting and debate access to more detail concerning the new
King Alfred. One councillor was concerned that the enterprise might
well overrun the £47 million projected – to which the answer is
that major works frequently run over budget and no guarantee can be
give. There was a call for the public to be informed about the
detailed business case. (Argus
14/8/24)
It will be interesting to learn
who is to be the architect of the project, and what ideas the design
team come up with; it seems the new King Alfred will be built on
where the car park is today.
It
is hoped that at a further meeting in the summer of 2025 there will
be an agreement on the design to be chosen. In any case no work is
expected to happen before early 2026. In view of the neglect the old
King Alfred has suffered, it is surprising to note that it is the
‘most well-used leisure centre in the city’. Therefore, the
council and Freedom Leisure – the facility’s operator – will
try and keep it open for as long as possible with repairs as
necessary. (Argus
16/8/24)
Sources
Argus
Brighton & Hove Independent 8 January 2016 / 15
January 2016 / 5 February 2016 / 12 February 2016 / 19
July 2016.
Encyclopaedia of Hove and Porstlade
Hove Council Minutes
Ordnance Survey Maps
See also the History of
HMS King Alfred Hove
Copyright © J.Middleton 2016